YEDİGÖZE Dam And Hepp Hydro Mechanical Equipment Project

YEDİGÖZE Dam And Hepp Hydro Mechanical Equipment Project


Project Description

 

Place ADANA / TURKEY
Customer SANKO YEDİGÖZE ELEKTRİK ÜRETİM VE TİCARET A.Ş.
Services Engineering Services
Design Type Detail Design
Contract Date 19.02.2009
Completion Date 31.05.2011
Information About the Project

PROKON-EKON Group has undertaken the design, engineering, manufacturing, erection, testing and commissioning of all hydromechanical equipment, and civil works for water intake structure, spillway structure and penstock supports for Yedigöze Sani Bey Dam and the hydroelectric plant.

Yedigöze Sani Bey Dam is a rock fill dam and the upstream face is covered with reinforced concrete, thalweg elevation is 105 m and the crest elevation is 131 m.

The hydrolic plant is composed of two units, which has 369.84 m3/s maximum project inflow 95.50 m gross head and 317 MW installed capacity.

Prokon provided the design and engineering services for all hydromechanical equipment in this project.

The following structures and units are designed by PROKON:

– Water intake structure stoplog and hoisting beam
– Plant building Inlet pipe gate amd hoisting beam
– Spillway stoplog and hoisting beam