TF-3 Extension Project & Secondary Production Area Rearrengement

TF-3 Extension Project & Secondary Production Area Rearrengement


Project Description
Place İzmir/TURKEY
Customer Philsa Philip Morris Sabancı
Services Construction Management, Consultancy Services, Construction Supervision Services
Contract Date 01.04.2015
Completion Date 01.04.2016
Information About the Project Philsa Philip Morris Sabancı TF-3 Production Area Extension Project, Secondary Production Area Project and TF-2 Climatization Floor Construction Project Management Services are provided by PROKON.

Project Management Services are listed below;

  • TF-3 Production Area Extension Project
  • Design of the area used by Philsa as a Primary DCC (Direct Conditioning Cylinders) area according to the requirements of the Secondary Production area,
  • Control of the productions of the TF-2 Air Conditioning Area Project and the completion of the procedure at the end of the work.

The following services are also provided for the project;

  • Coordination between Philsa Engineering Department, Project Designer, Contractors and Building Audit Company
  • Providing necessary informations to selected contractors, following Philsa’s Work Permission Procedures
  • Determination of acceptance criterias for tests and reports, preparation of procedures, recording test results
  • Responding all questions from contractors
  • Cost control and change management system
  • Work schedule follow-up
  • Preparation of monthly site reports and construction pictures obtain
  • Follow up and Coordination of official transactions
  • Preparation of specifications for out-of-scope works if demanded
  • Completing the substantial completion date procedure
  • Control and approval of as-built projects prepared by contractors