SEYİT ÖMER Thermal Power Plant Ash Dam And Ash Conveying System Project

SEYİT ÖMER Thermal Power Plant Ash Dam And Ash Conveying System Project


Project Description

 

Place KÜTAHYA / TURKEY
Customer GENERAL DIRECTORATE OF TEAŞ DEPARTMENT OF CONSTRUCTION
Services Engineering Services
Design Type Basic Design, Detail Design
Contract Date 06.10.1997
Completion Date 28.09.2000
Information About the Project

Within the scope of the project Prokon provided engineering services for the following structures;

• Unit no 2  Ash Disposal Conveyor,
• Unit no 2. Coal Transfer Conveyors and Structures,
• Unit no 3. Cooling Water Piping system,
• Unit no 1., 2., 3., 4. Alternative ash transport system
• Unit no 1., 2., 3., 4. Ash disposal area rehabilitation
• Ash dam and ash transport system to the dam.