Kışladağ Gold Mine Phase IV Expansion Project

Kışladağ Gold Mine Phase IV Expansion Project


Project Description
Place Uşak/TURKEY
Customer Tüprag Metal Madencilik San. ve Tic. A.Ş. / Eldorado Gold
Services Multi – Disciplinary Engineering Services

(Architectural, Structural, Electrical, Mechanical, Infrastructural Engineering Services)

Technical Support

Design Type Basic Design, Detail Design
Contract Date 09.03.2015
Completion Date 20.10.2016
Information About the Project PROKON Mühendislik ve Müşavirlik A.Ş. provided Multi-Discipline Basic and Detail Design Engineering Services for Kışladağ Gold Mine Phase IV Expansion Project. Also Technical Support is provided within the scope of the proejct.

The expansion is comprised of a new crushing and screening circuit (incorporating coarse ore stockpile and reclaim, secondary screening and crushing, tertiary screening and crushing) and modifications to the existing ADR plant. The expansion contributed an additional 7.5 million tonnes per annum capacity to the existing 12.5 million tonnes per annum (mtpa) crushing capacity. It encompassed a new coarse ore stockpile and reclaim system, a three-stage crushing and screening circuit and a modified recovery (ADR) plant. The scope of the project is concentrated within the Crushing Plant, Heap Leach (Fine Ore Stockpile/Reclaim), and ADR.

Engineering Services provided for the Project are as below;

  • Detailed General Design
  • Detailed Civil Design
  • Detailed Mechanical Design
  • Detailed Piping Design
  • Detailed Building Service Design
  • Detailed Structural Concrete Design
  • Detailed Structural Steel Design
  • Detailed Architectural Design
  • Geotechnical Support
  • Project Controls
  • Capital Cost Estimate
  • Project Schedule
  • Construction Specifications
  • Removing of Holds and As Builts
  • Site Visits