KARTAL KAYNARCA Metro Line Project

KARTAL KAYNARCA Metro Line Project


Project Description

 

Place İSTANBUL / TURKEY
Customer İSTANBUL METROPOLITAN MUNICIPALITY
Services Multi – Discipline Engineering Services (Architectural, Structural, Electrical, Mechanical, Infrastructural Engineering Services)
Consultancy Services
Construction Supervision Services
Design Type Detail Design
Contract Date 03.05.2013
Cooperated Firms OPTIM
OBERMEYER
Information About the Project
  • The Project covers 4,2 km length 2 metro tunnel, 3 station and pedestrian connection tunnels and other electromechanic work. Also 5 metro station pedestrian access tunnels are included within the scope of the Project.
  • The Project covers the design review, additional Project Services and consultancy services during the construction period.