Project Description
Place İZMİR / TURKEY
Customer İZMİR GAZ
Services Engineering Services
Infrastructural Design
Construction Supervision Services
Contract Date 01.11.2005
Completion Date 30.09.2007
Information About the Project

In April 19th, 2005, Contract about Distribution System Design and As-Built Studies was signed between Prokon and İzmirgaz.

Under the scope of the design studies, City Feed and Zone Regulator Station, 438.895 km length Steel Line and 9.025.083 km length PE Distribution Line with various diameters are design according to 30-year-projection.

As-Built studies has been completed in April, 2010.

Under the scope of the Construction Supervision Contract, signed in November 1st, 2005, 109.255,85 km length Steel Line, total of 1.211.329,7 km length of PE Line and total of 34.365 Service Lines Constructions, and also constructions of 3 RMS-A, 4 MS and 57 BR Stations has been controlled by Prokon.