İSDEMİR OG Gas Holder

İSDEMİR OG Gas Holder


Project Description

 

Place İSKENDERUN / TURKEY
Customer İSDEMIR İSKENDERUN DEMİR VE ÇELİK FABRİKALARI A.Ş.
Services Engineering Services
Design Type Detail Design
Contract Date 20.03.2006
Completion Date 20.05.2007
Project Manager  
Cooperated Firms  
Information About the Project

PROKON Mühendislik ve Müşavirlik A.Ş. has provided the multi discipline detail engineering services of İSDEMİR Gas Storage Facility within the scope of project.

The project has been realized as an EPC Contract in turnkey basis for İSDEMİR İskenderun Iron and Steel Company in Turkey. The project consisting of floating piston type two gas holders and piping system, excess gas flare stack, converter gas recovery station, boosting, wet type ESP and mixing stations. The gas holders were constructed to store blast furnace and converter gases of İSDEMİR Steel Plant. The main technology sub-contractors were MB Engineering Services Ltd., Clayton Walker Gas Holder Division (England) and SMS Demag AG (Germany).

The project covers the engineering, production and procurement of the equipment, electrical-automation works and commissioning of one Gas Holder with floating piston having a capacity of 60.000 m3, 3 wet type electro filter, 3 booster fan, 3 gas collecting station, U type gas holders in various sizes and various valves and instruments.