ERZİNCAN Earthquake Rehabilitation And Reconstruction Project

ERZİNCAN Earthquake Rehabilitation And Reconstruction Project


Project Description

 

Place ERZİNCAN / TURKEY
Customer REPUBLIC OF TURKEY PRIME MINISTRY PROJECT IMPLEMENTATION UNIT
Services Construction Supervision Services
Consultancy Services
Contract Date 28.02.1993
Completion Date 30.07.1996
Information About the Project

Within the scope of Erzincan Earthquake Rehabilitation and Reconstruction Project, the Hospitals listed below were reconstructed instead of the Social Security (SSK), State & Military Hospitals which had collapsed due to severe Earthquake occurred on March 13th, 1992.

. 100 Bed Capacity SSK Hospital and Nursing Hostel (60 Bed Capacity), 9.077 m2
. 150 Bed Capacity State Hospital and Nursing Hostel (30 Bed Capacity), 10.179 m2
. 100 Bed Capacity Military Hospital and Heating Center, 8.735 m2
All three Hospitals’ Medical Equipment and Furniture Installation were provided.

The Project was financed by World Bank.

Design and Engineering Services

Architectural and Landscaping,
Structural System (with respect to Earthquake Specifications),
Mechanical Works (Heating, Ventilating, Laminar Current Hygenic AC, Plumbing & Fire System),
Electrical Works (Power, Lighting, Grounding, KGK, Nurse Calling Center, Music, Sound System and Transformer & Distribution Panel for Operating Room).

Tender File Preparation

Contract General and Special Conditions
Technical Specifications, Estimate and Quantity Survey

Site Inspection Services

Work Schedule, Cost, Quality Control and Tracing
Coordination
Reporting