Design and Engineering Services of Şişecam Polatlı TR-8 New Production Line

Design and Engineering Services of Şişecam Polatlı TR-8 New Production Line


Project Description
Place Ankara/TURKEY
Customer Şişecam
Services Design and Engineering Services, Preparation of Tender Documents, Site Technical Support
Design Type Basic Design, Detail Design
Contract Date 15.08.2018
Completion Date 15.11.2019
Information About the Project The Polatlı TR8 line is an additional project to the TR7 line in the Polatlı OSB.

New Production Facility is composed of the following units;

  • Blast furnace building 10.000 m2
  • Bath building 7.400 m2
  • Cooling and cutting building 4.000 m2
  • Warehouse 28.000 m2
  • Auxiliary facilities 10.000 m2
  • Cullet galleries

PROKON provided the following services within the scope of the project;

  • Design and Engineering Services
  • Preparation of Tender Documents
  • Site Technical Support