Place |
İstanbul/TURKEY |
Customer |
Istanbul Project Coordination Unit |
Services |
Design and Construction Supervision Services |
Design Type |
Preliminary Design and Detail Design |
Contract Date |
27.05.2013 |
Completion Date |
01.06.2018 |
Information About the Project |
The purpose of project is to demolish existing schools to reconstruct new ones since existing buildings are found economically infeasible to retrofit and also existing buildings do not functionally satisfy required demands of Provincial Directorate of National Education. Within the scope of Consultancy Services for Design and Reconstruction Supervision of 45 Schools in İstanbul (ISDB-CB1.5);
1- Design and Tender Documents Preparation of 44 School Buildings (298.149 m2) and Üsküdar Altunizade Dormitory Building (26.762 m2)
2- Consultancy and Construction Supervision of 35 School Buildings (237.681 m2) during the Construction Stage and Defects and Liability Period services were provided.
Engineering and Design Services
Construction Supervision Services
|
Project Description
- 0
- July 17, 2022
- Education