Place |
İstanbul / TURKEY |
Customer |
Republic of Turkey, Istanbul Governorship, Istanbul Project Coordination Unit (IPCU) |
Services |
Design Review and Engineering Services Supervision Services |
Design Type |
Detail Design and Multi – Discipline Engineering Services |
Contract Date |
01.08.2012 |
Completion Date |
31.12.2018 |
Information About the Project |
The Project has been executed under Istanbul Seismic Risk Mitigation and Emergency Preparedness Project (ISMEP) by Istanbul Project Coordination Unit that is established under the Istanbul Special Provincial Administration (ISPA). Existing Kartal Lütfi Kırdar Education and Training Hospital is one of the biggest hospitals in İstanbul Area that serves 15.000 patients per day. The total estimated surgeries are 40.000 per year. However, this hospital complex was found infeasible for retrofitting since the existing structures are inadequate from the functional perspective and the buildings are in poor condition and require significant maintenance. Therefore, the design for new Kartal Lutfi Kırdar Education and Training Hospital has been conducted under the ISMEP with the fund of European Investment Bank. The Contract of Prokon has covered the design review and construction supervision of new Kartal Lütfi Kırdar Hospital campus including but not limited to the construction of the new hospital buildings having 1105 beds and 301.853m2 built-up area (2B+G+12 Floor) of which 55.000 m2 is underground parking area and all related infrastructural works as well as demolishing of the old buildings. The design of the Hospital meets the requirements and the specific functions of the units as well as the requirements of National and International Hospital Regulations and Rules built in Seismic Area. The future role of new Kartal Lutfi Kırdar Hospital is defined as a disaster centre, which should remain operational during an earthquake thus any specific supervision tasks resulting from this function shall be the Consultants responsibility for the supervision of construction works. The seismic design targets to cover the “Operational Building” performance level in DBE (Design Basis Earthquake) and “Life Safety” performance level in MCE (Maximum Credible Earthquake) according to ASCE/SEI 41-06. Thus, the structural system of the hospital is reinforced concrete and the design covers 855 seismic base isolators for an earthquake resistant hospital complex. The hospital is the 1st ‘State Hospital’ in Turkey has achieved LEED (Leadership in Energy and Environmental Design) Gold Certification that is the highest ranking certificate programme run by the USGBC (United States Green Building Council). The full-fledged health complex brings opportunity to combine future technology with patient comfort. Kartal Dr. Lütfi Kırdar Training and Research Hospital has also awarded by EDGE (Excellence in Design for Greater Efficiencies) Green Building Certificate that is performed by IFC (International Finance Corporation), a member of the World Bank Group and the world’s largest development organization for the development of the private sector in developing countries.
PROKON provided following engineering services;
Design and Engineering Services; – Check/review
Supervision Services
|
Project Description
- 0
- July 17, 2022
- Health