Place | Aksaray/TURKEY |
Customer | Brisa Bridgestone Sabancı Lastik Sanayi ve Ticaret A.Ş. |
Services | Multi – Disciplinary Engineering Services
(Architectural, Structural, Electrical, Mechanical, Infrastructural Engineering Services) |
Design Type | Basic Design, Detail Design |
Contract Date | 01.12.2015 |
Completion Date | 30.11.2017 |
Information About the Project | PROKON provided preparation of Architectural, Structural Steel, Reinforced Concrete, Plumbing, HVAC-Piping, Fire, Electricity and İnfrastructure Projects and preparation of pre-construction tender documents In 2013, BRISA decided to invest in a new tire factory in Aksaray in order to meet the increasing demand for tires. The investment consists of 4 phases.
Phase 1 includes the following structures;
|
Project Description
- 0
- July 17, 2022
- Automotive and Tire, Featured Projects