Boğazlıyan Sugar Factory (10.000 Tons/Day Capacity)

Boğazlıyan Sugar Factory (10.000 Tons/Day Capacity)


Project Description

 

Place KAYSERİ / TURKEY
Customer KAYSERİ ŞEKER FABRİKASI A.Ş.
Services

Multi – Discipline Engineering Services (Architectural, Structural, Electrical, Mechanical, Infrastructural Engineering Services)

Construction Supervision Services

Design Type Basic Design, Detail Design
Contract Date 25.02.2005
Completion Date 06.11.2007
Cooperated Firms FIVES CAIL GROUP
Information About the Project

As being the biggest investment project of Kayseri Sugar Factories Co., largest and most modern sugar factory of Turkey, 10.000 tons/day Sugar Beet Slicing Capacity Boğazlıyan Sugar Factory has been realized as an engineering, procurement and construction (EPC) contract on turnkey basis covering all civil, mechanical, electrical and automation works, commissioning and startup of the sugar factory.

 

The project has been completed by OEP (Oyak İnşaat-Ekon-Prokon) and French Fives-Cail, Maguin Consortium. The complete design works were provided by Prokon. When finished, it was designed to operate 10.000 tons of sugar beet per day, which may also reach 12.000 tons per day. Also a storage area with 224.000 ton sugar beet capacity was built. The beet washer unit’s hourly capacity was 420 tons. Also the facility has the capacity to store 60.000 tons granulated sugar and 20.000 tons packaged sugar.

 

The units of 10.000 Tons/Day Capacity Boğazlıyan Sugar Factory are listed below:

  • Main Production Building (130 m x 30 m x 21 m)
  • Beet Acceptance and Analysis Laboratory
  • Weigh Bridges
  • Beet Storage Areas and Conveyor Systems
  • Beet Washing Unit
  • Beet Chopping Unit
  • Boiling and Diffusion Unit (10.000 Tons/Day)
  • Pulp Presses
  • Syrup Heaters
  • Syrup Refining Unit
  • Filter Presses
  • Evaporation
  • Ion Exchange UnitCrystallization
  • Sugar Drying Unit
  • Sugar Conveyors
  • Sugar Storage and Packaging Units
  • Boiler Water Processing Unit
  • Vacuum Lines and Cooling Tower
  • Steam Boilers (2 x75 Tons / Hour, 1 x 20 Tons / Hour, 1 x 10 Tons / Hour)
  • Turbine Building: 2 x 7.5 MW
  • Piping: 45.000 m
  • Power Distribution Systems
  • Automation System
  • Laboratories
  • Fuel Oil Tank
  • Molasses Tanks
  • Wastewater Treatment Plant (350 m3/hour capacity)
  • Road and Parking Areas (56,000 m2)
  • Sewer and Storm Water System (11,800 m)