BEKİRLİ Power Plants (2×600 MW) Raw Water Supply From The Sea

BEKİRLİ Power Plants (2×600 MW) Raw Water Supply From The Sea


Project Description

 

Place ÇANAKKALE / TURKEY
Customer İÇDAŞ ÇELIK ENERJİ TERSANE VE ULAŞIM SANAYİ A.Ş.
Services Engineering Services
Design Type Basic Design, Detail Design
Contract Date 30.10.2008
Completion Date 31.05.2009
Information About the Project

Basic and detail engineering services were provided for the systems of 50,000 lt/sn (180.000 m³ /s) capacity water intake system, pumping, pumping to the condenser of power plant and discharging water back to the sea required for Bekirli 2×600 MW Power Plant.