BAZIFA Cement Factory Steel Construction Drawings

BAZIFA Cement Factory Steel Construction Drawings


Project Description

 

Place SULEYMANIYE / NORTHERN IRAQ
Customer UCH UNITED CEMENT HOLDING
Services Architectural Design
Structural Steel Engineering
Reinforced Concrete Design
Design Type Detail Design
Contract Date 01.09.2005
Completion Date 30.09.2007
Project Manager  
Cooperated Firms KRUPP POLYSIUS
Information About the Project

The civil and structural steel detail engineering services for Bazian Cement Plant  were provided by PROKON

·         2 Raw Material Crusher Buildings

·         Raw Material and Clinker Carrier Conveyor Band Support Bridges and Reinforced Concrete Galleries

·         Additive Storage (295 m x 55 m x 18.5 m)

·         Pre Homogenization Hall (D=107 m , H=33 m)

·         Raw Material and Cement Mills Supply Bunkers and Support Buildings

·         Raw Meal Silo (D=20 m, H=96 m)

·         Clinker Silo (D=47 m, H=22 m), Faulty Clinker Silo and building

·         3 Cement Silos (D=20 m, H=84 m)

·         Raw Meal Mill, Cement Mill Buildings and Related Mill Foundations

·         Rotary Kiln Foundation and Walkways

·         Pre Heater Building (35 m x 26,5 m x 106 m)

·         Clinker Cooler Building

·         Packing Units

·         Electrofilter Support Structures

·         Various Gas Canal Support Steel Structures and Fan Foundations

·         Electrical Buildings

·         Cable and pipe bridges (approximately 1000 m)

·         Fuel Oil facilities