Project Description

 

Place ISKENDERUN / TURKEY
Customer ATLAS ENERGY
Services Construction Supervision Services
Multi – Discipline Engineering Services (Architectural, Structural, Electrical, Mechanical, Infrastructural Engineering Services)
Design Type Detail Design
Contract Date 01.07.2010
Completion Date 03.07.2013
Information About the Project

Atlas Energy (1+1) X 600 MW Iskenderun Coal-Fired Thermal Power Plant Project covers the following units and systems:

  • 2 x 600 MW Supercritical Type Pulverized Coal Fired Boiler
  • 2 Steam Generator Sets and Auxiliary Systems (Chimney, Turbine-Generator Building, Water Discharge Building, Seawater Cooling Facility Building, Coal Storage Building etc. )
  • Water Intake and Discharge System (2×95.000=190.000 m³ /h)

Each Unit Generates 4.260.000.000 kWh annually.

Main Fuel: Imported Coal

Ignition and Assistant Fuel: Natural Gas

 

İskenderun Atlas Power Plant is the 13th biggest Power Plant of Tukey, 4th biggest Imported Coal Fired Power Plant and the biggest Power Plant of Hatay.

 

PROKON has provided design, project management and construction supervision within the scope of consultancy services covering the following phases and services;

Phase 1- Engineering and Design Services

Engineering and Consultancy Services for the Works under Client’s Scope;

  • Mapping Works,
  • Ground Improvement Works,
  • Preparation of Basic and Detail Design of Coal Stock Hall and Cooling System using Sea Water (Water Intake and Discharge System)
  • Preparation of Tender Files
  • Procurement Management
  • Control, Coordination and Seeking Economical Solution Alternatives for Engineering Drawings of EPC Contractor.

Phase 2- Design Review of Mechanical, Electrical, I&C and Process Design of EPC Contractor

 

Phase 3- Supervision Services

  • Construction Supervision Services
  • Supervision of Mechanical, Electrical Erection Works