AŞKALE Cement Factory Clinker Production Line (3500 Tons/Day)

AŞKALE Cement Factory Clinker Production Line (3500 Tons/Day)


Project Description

 

Place ERZURUM / TURKEY
Customer EKON A.Ş.
Services Engineering Services
Design Type Basic Design, Detail Design
Contract Date 08.02.2006
Completion Date 30.06.2007
Project Manager  
Cooperated Firms  
Information About the Project

PROKON has provided the following services within the scope of the project:

·         Architectural, mechanical, reinforced concrete and structural steel design of the units,

·         System balance and material flow schemes,

·         Determination of the needs in process, mechanical and electrical points and their connections between the existing systems.

The following structures and units are designed by PROKON:

 

·         Preheater Tower

·         Rotary Kiln Foundation

·         Clinker Cooling Units

·         Clinker Transportation System

·         Cable Galleries

·         Electrical design

·         Clinker Electro filter Building

·         Coal Mill Building

·         Various Gas Canals

·         Fan Foundations and Chimney