Ankara Metro Tandoğan – Keçiören Metro Line Project

Ankara Metro Tandoğan – Keçiören Metro Line Project


Project Description
Place ANKARA / TURKEY
Customer ANKARA METROPOLITAN MUNICIPALITY GENERAL DIRECTORATE OF EGO
Services Consultancy Services

Construction Supervision Services

Contract Date 12.08.2003
Completion Date 10.07.2007
Cooperated Firms Optim Obermeyer Teknik Bilgi İşlem Merkezi A.Ş.
Information About the Project PROKON provided engineering and supervision services for Ankara Tandoğan-Keçiören Metro Line Project.

Ankara Metro, Tandoğan-Keçiören Rail Transport System connects Tandoğan and Keçiören Stations with a 10,59 km long line. The double-track railway line has been constructed together with 9 underground stations. The lane was constructed in different type of track ways; 7,23 km long Tunnel, 0,684 km long Cut & Cover line, 1,26 km long Station Lines. The tunnels were constructed in Cut & Cover and TBM Tunneling Methods.

Services within the scope of the project are listed below;

Design Services

Revision of Metro Lines

  • Revision of Existing Travelling Estimations
  • Determination of Commissioning Scenarios for the Entire Project
  • Determination of Fleet According to the Travelling Estimation and Train Frequency

Preparation of Tender Documents for Construction Works

Project Coordination, Review and Approval

  • Architectural and Landscaping ,
  • Reinforced Concrete Bearing System
  • Mechanical Works (Heating, Ventilating, AC, Plumbing & Firefighting System)
  • Electrical Works (Power, Lighting, Grounding)

Construction Management

Contract Management

Quality Control / Quality Assurance

Cost Control, Management of Change Orders

Planning and Program Control

Occupational Health and Safety