Ankara Metro 1st Phase Aşti – Çayyolu Metro Line Project

Ankara Metro 1st Phase Aşti – Çayyolu Metro Line Project


Project Description
Place ANKARA / TURKEY
Customer ANKARA METROPOLITAN MUNICIPALITY GENERAL DIRECTORATE OF EGO
Services Construction Supervision Services
Consultancy Services
Service Starting 17.09.2002
Completion 14.06.2007
Cooperated Firms OPTIM
OBERMAYER
Information About the Project

PROKON provided consultancy and supervision services for 1st Phase AŞTI-Çayyolu Metro Line Project.

Ankara Metro, 1st Phase AŞTI-Çayyolu Rail Transport System connects AŞTİ and Köy Hizmetleri Stations with a 5575 m long line and  Köy Hizmetleri and Ümitköy Stations with 3815 m long line. The double-track railway line was constructed together with 7 underground stations. The lane was constructed in different type of track ways; 0,140 km long At-Grade line, 0,070 km long Cut Line, 5,955 km long Cut&Cover Line, 1,945 km long Tunnel, 1,28 km long 7 station lines. The tunnels have been constructed in Cut&Cover and TBM Tunneling Methods.  The total closed area of 7 underground stations is 55.000 m2.

Services within the scope of the project are listed below;

–          Design Services:

·         Preparation of Updated Feasibility Report

·         Preparation of Final Design of Trackways

·         Coordination, review and approval of

o    Architectural and Landscaping ,

o    Reinforced Concrete Bearing System

o    Mechanical Works (Heating, Ventilating,   AC, plumbing & fire fighting system)

o    Electrical Works (Power, Lighting, Grounding)

–          Construction Management

·         Contract Management

·         Quality Control / Quality Assurance

·         Cost Control , management of change orders

·         Planning and program control

·         Occupational Health and Safety