2×660 MW İSKENDERUN Sugözü Imported Coal Fired Power Plant

2×660 MW İSKENDERUN Sugözü Imported Coal Fired Power Plant


Project Description
Place İSKENDERUN / TURKEY
Customer GAMA – TEKFEN JOINT VENTURE
Services Multi – Discipline Engineering Services (Architectural, Structural, Electrical, Mechanical, Infrastructural Engineering Services)
Design Type Basic Design, Detail Design
Contract Date 01.08.2000
Completion Date 15.11.2003
Project Manager
Cooperated Firms BABCOCK BORSIG POWER
SIEMENS
Information About the Project

İskenderun Power Plant is the first power plant operating with imported coal contracted as “Build-Operate” system.  The power plant is built by the consortium of Babcock Borsig Power (Germany), GT Gama-Tekfen Joint Venture (Turkey) and SİMKO (Turkey) PROKON has undertaken the local engineering and design works of the plant as part of the GT Joint Venture.

Engineering and design management including multi-disciplined engineering, architectural services and coordination, site technical support were within the scope of the project. Also the detailed services are listed below:

·         Plant Lay-out

·         Topographical survey & set out  of grid lines

·         Geotechnical survey & report

·         Site preparation

·         Architectural and engineering design services including structural, mechanical, piping, electrical and I & C

·         Technical support during implementation of the work

·         Overall design work schedule monitoring

·         Coordination between units and engineering disciplines

The buildings and structures within scope of work provided by PROKON are as follows:

·         Boiler House

·         Turbine House

·         Bunkers

·         Electrical Control Building

·         Secondary Boiler House

·         Coal Storage System (Crusher House, Screening system, Coal Storage Area etc.)

·         Ash Silos and Conveyor System

·         Stacks

·         Foundations of Electro Filters

·         Waste Water Recovery Plant

·         Desulphurization Systems

–       Limestone crushing and storage

–       Lime fluid Handling system  & tanks

–       Gas Washing system

–       Service Building

–       Gypsum Conveyor system

·         Raw Water tanks

·         Water Treatment Facility

·         Gypsum Dewatering system

·         Water Intake and discharge structures and pump station

·         Workshop and depot

·         Management Building

·         Cafeteria

·         Field excavation, Access Roads, Bridges and culverts

·         Roads

·         Rainwater discharge

–       Sewer

–       Cable Channels

–       Pipe Galleries

–       Water Intake and Jetty systems

–       650 m Coal Loading pier